Thursday, 24 November 2011

Day 22

First job this morning was to pay out and flake the aft mooring line onto the poop deck. Once this was complete, the pressure washer was rigged and I drove to winch to put the line back on, whilst the boatswain washed the line. Bridge watch tonight was hot and not a lot happening, usual met forecast sent to the met office and a compass correction by star (Achenar). The last waypoint and turn before Cape Town has just been done, this leg is over 3000nM.
Air and Sea temp at midnight 28°C


No comments:

Post a Comment