Wednesday 9 November 2011

Day 7

Well after a lie in this morning (work starting at 0700!) I was overseeing the loading of cargo into the aft hold, making sure the stevedores were doing things safely. I was helping to stow some steel on top of all the drums that I counted on yesturday, the count was bang on! more luck than judgement. After the 'tween deck was closed, I was working with the boatswain to tidy up in there in preparation for cargo loading tomorrow..
    There was the main ships crane loading No.2 hold, a shore based crane loading the helideck and our own stores crane loading miscellaneous office equipment, tools, ropes, etc.

My kit bag also arrived today




3 x pairs of socks
1 x thermal work boots
2 x work trousers
1 x duvet salopets
1 x duvet jacket
1x thermal boiler suit
2 x glove liners
1 x thermal work gloves
1 x cold weather work gloves (suitable for conditions down to -25° C)
1 x thermal high vis jacket
2 x fleeces
3 x thermal base layers
1 x buff
1 x knife
1 x sunglasses
1 x waterbottle
1 x belt
1 x warm hat
1 x thermal hard hat